Engineered for demanding applications, this 1.3" IPS Schedule 80 brass seamless pipe offers superior corrosion resistance and mechanical integrity for critical fluid and gas transport.
| Standard | DIN 933 |
| Material | Brass |
| Finish | Galvanized |
| Grade | N/A |
| Pipe Size | 1.3" |
| Outside Diameter | 1.729" |
| Wall Thickness | 0.482" |
Trusted by engineers across multiple sectors, this Brass Schedule 80 seamless pipe is manufactured to exacting standards, ensuring reliability and longevity. With a nominal pipe size (IPS) of 1.3 inches, it features a precise outside diameter of 1.729 inches and a substantial wall thickness of 0.482 inches. This robust construction provides exceptional pressure ratings and resistance to deformation, making it suitable for high-stress environments. The inherent properties of brass, including excellent corrosion resistance and machinability, further enhance its performance in various industrial and marine settings.
This component strictly adheres to the tolerances, material specifications, and quality benchmarks set by the world's leading industrial manufacturers.
1. Ensure pipe ends are clean and free of debris. 2. Apply appropriate flux and solder to joint components. 3. Heat joint evenly and apply solder until capillary action draws it fully into the gap.
| Standard System | Designation |
|---|---|
| ISO Equivalent | ISO 9001:2015 Mfg |
| DIN Equivalent | Industry Standard |
| Primary Standard | DIN 933 |
| Burst Pressure | 4x Working Pressure (Typical) |
| Working Pressure | See Manufacturer Specs |
| Temperature Range | -20°F to 400°F (-29°C to 204°C) |
| Copper (Cu) | 60.0 - 63.0% |
| Zinc (Zn) | Balance |
| Lead (Pb) | 2.5 - 3.7% |
| Size / Type | Est. Weight (lbs/100) | Shipping Weight (kg) |
|---|---|---|
| Standard | Varies by dimension | Contact Sales |
| Environment | Rating |
|---|---|
| Indoor / Dry | Excellent |
| Outdoor / Exposed | Excellent |
| Marine / Saltwater | Not Recommended |
| Chemical / Acidic | Not Recommended |
| ❌ Mistake | ✅ Correct Approach |
|---|---|
| Using incorrect flux for brass soldering. | Always use a flux specifically formulated for brass or copper alloys to ensure proper solder flow and joint integrity. |
| Insufficient heating of the joint. | Adequately heat both the pipe and fitting to the correct soldering temperature to allow the solder to flow properly via capillary action. |
A: This Seamless Pipe, Schedule 80 is manufactured from Brass.
A: Industrial fluid transport, Marine plumbing systems, Chemical processing equipment.
Conversion factor: 1 ft-lb ≈ 1.356 Nm
| Status | Mating Component | Standard | Torque Spec | Engineering Notes |
|---|---|---|---|---|
| No verified compatibility data found for this component. | ||||